Priority Development Sites Analysis

Magenta B

Capacity: 32 units

Advantages:

  • Paved surface

  • Street accessible

  • Near existing infrastructure

  • Approximately 1.5 acres

Key Considerations:

  • Requires utility connections

  • Need to verify infrastructure capacity

  • Primary pilot location

Parcel 7

Capacity: 24+ units

Advantages:

  • Paved surface

  • Adjacent to existing facilities

  • Potential for expansion

  • Approximately 1 acre

Key Considerations:

  • Near columbarium expansion space

  • Requires coordination with Cemetery Association

  • Utility assessment needed

Parcel 4A

Capacity: TBD

Advantages:

  • Paved surface

  • Alternative to North Campus options

  • Available for development

Key Considerations:

  • South Campus location

  • Added after other options ruled out

  • Infrastructure assessment needed