Priority Development Sites Analysis
Magenta B
Capacity: 32 units
Advantages:
Paved surface
Street accessible
Near existing infrastructure
Approximately 1.5 acres
Key Considerations:
Requires utility connections
Need to verify infrastructure capacity
Primary pilot location
Parcel 7
Capacity: 24+ units
Advantages:
Paved surface
Adjacent to existing facilities
Potential for expansion
Approximately 1 acre
Key Considerations:
Near columbarium expansion space
Requires coordination with Cemetery Association
Utility assessment needed
Parcel 4A
Capacity: TBD
Advantages:
Paved surface
Alternative to North Campus options
Available for development
Key Considerations:
South Campus location
Added after other options ruled out
Infrastructure assessment needed